Tuesday, June 17, 2014

"I've been framed!" - the camper

Much progress has been made since our last post on finishing the interior paneling in the camper.

The interior is now painted.  The ceiling is white and the walls are a slight gray color. It's only slightly noticeable, though not at all in this photo.


After paint, I worked on building the bed structure and some electrical work.

This photo was just before beginning framing the bed. The two areas in the rear were intentionally left uncovered so we would have access to the tail light wiring.

Some bed framing and the electrical panel being wired in a little.


Bed framing completed. There will be two storage areas under the bed: one in the rear, accessible by the outside rear door, and one in the front/interior of the camper, accessible either by doors in the front, or a hinging bed on gas shock lifts. 

I also built the above-bed storage cabinet and mounted it to the wall/ceiling.  It will have two doors and be painted white.

After the bed, I  started building the kitchen base cabinet. The microwave will sit in its own cubby, and the rest of the cabinet will be various storage areas. The sink will be mounted on the left side of the counter with counter space to the right of the sink.

 The progress thus far.  More to come!







No comments:

Post a Comment