Cleaning up and cutting out the old floor, which was (yet again) infested with carpenter ants.
Just a little trim work left--cutting the plywood and insulation around the bathroom.
Framing the floor.
Holes drilled on the underside of the plywood to allow clearance for the perimeter bolts.
These bolts. :)
Next section of flooring ready for plywood.
Extra reinforcing in the door area.
Adding a generous coating of insect poison to the floor and swept it into the cracks/corners.
Plywood down!
Nice to walk into the camper without balancing on 2x4 runners. :)
More to come...
-Sam
No comments:
Post a Comment